Major road projects in Hamilton

The multi-year road, highway and interchange projects in Hamilton that have an official project source: what is being built, where, its status and its timeline as stated on the day this page was checked.

Every answer sourcedAdministered by The Ontario Ministry of Transportation builds provincial highway projects; the City of Hamilton's Engineering Services builds City road projects. Every answer below was checked against its source on November 26, 2026; the source is linked under each one.

The short answer

The Province started building a new Highway 5 and Highway 6 interchange in Waterdown in fall 2026, with no completion date published. The City plans to resurface Main Street from Dundurn Street to the Delta and convert it to two-way traffic, with all work to finish by the end of 2027, and to widen Rymal Road from Upper James Street to Dartnall Road, with construction planned for 2028 to 2031. Each timeline is as its source stated on November 26, 2026.

Last verified

From 5 official sources, administered by The Ontario Ministry of Transportation builds provincial highway projects; the City of Hamilton's Engineering Services builds City road projects.

Provincial highway projects

2 questions
  1. What is being built at Highways 5 and 6 in Waterdown?

    A new interchange. The Province announced on October 30, 2026 that it had started construction to replace the intersection of Highways 5 and 6 with a new bridge carrying Highway 5 over Highway 6 and new on- and off-ramps. The project also widens a section of Highway 5 to six lanes and adds a new commuter parking lot and multi-use paths for pedestrians and cyclists, along with new municipal roads, water mains and sanitary sewers the interchange needs. GIP Paving Inc. holds the construction contract.

    Watch for: The Province's announcement gives no completion date. For short-term lane and road closures, see this site's road closures guide.

    Source: Government of Ontario, Ontario Starting Construction on New Interchange in Waterdown

  2. Which other provincial highway projects in Hamilton are scheduled?

    The Ministry of Transportation's 2026-2029 Southern Highways Program, summer 2026 edition, lists the Highway 5 at Highway 6 interchange as a new interchange, 6.0 km, estimated at $100 to $250 million, with its target completion "not available". It also lists intersection improvements at Highway 6 and York Road, under way with a 2026 target, and planned Highway 403 resurfacing, noise barriers and bridge rehabilitation from 0.95 km west of Highway 6 north to 1.5 km east of the Lincoln Alexander Parkway, starting 2028-2029 with completion not available.

    Hwy 5 at Hwy 6 interchange
    New interchange; $100 to $250 million; target completion not available
    Hwy 6 at York Rd.
    Intersection improvements; under way; target 2026
    Hwy 403, west of Hwy 6 north to east of the Linc
    Resurfacing, noise barriers, bridge rehabilitation; planned start 2028-2029

    Watch for: The program is a planning list the ministry updates; when it was published the Highway 5 and 6 interchange was still marked planned. Cost ranges are the ministry's estimates.

    Source: Government of Ontario, 2026-2029 Southern Highways Program

City road projects

3 questions
  1. When is Main Street being converted to two-way traffic?

    In its June 5, 2026 update to Council, the City said the Main Street Renewal and Redesign Project would be built in stages, with the two-way conversion last, after curb ramp, sidewalk and traffic signal work and road resurfacing, and that all works are planned to be complete by the end of 2027. Detailed design was finished and a two-stage tender was under way; staff expected the formal tender to start in early July, allowing a September 2026 construction start, with the project phased from late 2026 through 2027.

    Watch for: Those dates are as stated on June 5, 2026; the City said it would give more on the construction schedule in future updates, on its project page. Council directed the conversion in May 2022.

    Source: City of Hamilton, Communication Update: Main Street Project Updates (ENG2603)

  2. What will Main Street look like after the redesign?

    The project resurfaces Main Street from Dundurn Street to King Street East (the Delta). From Dundurn to Victoria Avenue there will generally be three eastbound lanes and one westbound lane to Bay Street, then two through lanes, one westbound lane and turn lanes from Queen Street to Victoria. From Victoria to Sherman Avenue there will be two eastbound lanes, one westbound lane and cycling lanes in each direction separated by curbs and flex posts. From Sherman to the Delta, the north curb lane becomes permanent on-street parking with curb extensions and trees.

    Watch for: The City says the cycling lanes do not reduce the number of vehicle lanes. The design also removes the slip-off right turn from Main Street to Dundurn Street South and rebuilds all intersection curb ramps to accessibility standards.

    Source: City of Hamilton, Communication Update: Main Street Project Updates (ENG2603)

  3. When will Rymal Road be widened?

    The City plans to widen Rymal Road between Upper James Street and Dartnall Road, about five kilometres, by one lane in each direction, with improved walking and cycling infrastructure and upgraded stormwater facilities. In July 2026 the City said the project was entering detailed design, with design and a construction tender to be completed over the next two years, and construction planned to start in 2028 and finish by 2031, phased over about four years; staff were examining ways to speed that up.

    Where
    Rymal Road, Upper James Street to Dartnall Road (about 5 km)
    Cost estimate
    About $107 million ($88 million road and storm sewer, $19 million other underground work)
    Construction
    Planned 2028 to 2031

    Watch for: The City estimates the cost at about $107 million. It said minor resurfacing and patching may be done on Rymal Road before construction. Timelines are as stated on July 28, 2026.

    Source: City of Hamilton, Communication Update: Advancing Rymal Road Improvements (ENG2604)

LRT road and bridge work

1 question
  1. What road and bridge work comes with the Hamilton LRT?

    The first LRT contract, awarded to Hamilton Transit Alliance, led by Aecon Infrastructure Inc., and announced by the Province on April 30, 2026, covers utility relocations, grade separations, road reconstruction and upgraded sidewalks and traffic control systems along the route, including 14 km of road reconstruction and 28 km of replaced and upgraded sidewalks. It also advances design work to replace the bridge over Highway 403, build an LRT underpass beneath the CPKC rail line near Gage Avenue and improve the Queenston Road bridge over the Red Hill Valley Parkway.

    Watch for: No construction schedule had been published for this work when this page was checked on November 26, 2026; this site's LRT guide has the current LRT closures.

    Source: Government of Ontario, Ontario Begins Civil and Utility Work for Hamilton LRT

Official sources and contacts

5 official pages
Government of OntarioOntario Starting Construction on New Interchange in WaterdownThe official page this guide’s first answer is checked against. The office that runs the service has the final word on a case of your own.Open news.ontario.ca
Who to contact
City of Hamilton lane restrictions and road closures
Current closures list

Sources

  1. Government of OntarioOntario Starting Construction on New Interchange in WaterdownPublished October 30, 2026 · Retrieved November 26, 2026
  2. Government of Ontario2026-2029 Southern Highways ProgramPublished August 7, 2026 · Retrieved November 26, 2026
  3. City of HamiltonCommunication Update: Main Street Project Updates (ENG2603)Published June 5, 2026 · Retrieved November 26, 2026
  4. City of HamiltonCommunication Update: Advancing Rymal Road Improvements (ENG2604)Published July 28, 2026 · Retrieved November 26, 2026
  5. Government of OntarioOntario Begins Civil and Utility Work for Hamilton LRTPublished April 30, 2026 · Retrieved November 26, 2026

Every answer on this page traces to one of these documents.

Last checked 5 official pages from Government of Ontario, City of Hamilton