Do I need a permit? Hamilton decks, basements, sheds
Project by project: what needs a building permit, what does not, the zoning limits and what it costs.
Summary
In Hamilton you need a building permit to finish a basement, build any deck attached to the house, put up a shed or garage over 15 square metres, move or add plumbing, or change the size of a window or door opening. You do not need one to re-shingle with the same material, replace windows like for like, paint, or lay flooring. Projects that need no permit must still meet the Zoning By-law; the Building Division is at 905-546-2720.
Administered by the City of Hamilton's Building Division. Every answer below was checked against its source on November 18, 2026; the source is linked under each one.
Decks, sheds and other outdoor projects
Do I need a permit to build a deck in Hamilton?
Yes, if it is attached to a building, whatever its size, or used with a swimming pool. A detached deck needs a permit if it is uncovered, larger than 10 square metres and more than 200 mm above the adjacent grade; if it is covered and larger than 10 square metres, at any height; or if it is 10 square metres or less but next to a door of the building and more than 600 mm above grade. Replacing or installing guards (railings) also needs a permit.
Attached deck or porch
permit required, any size
Detached, uncovered
permit if over 10 m² and more than 200 mm above grade
Detached, covered
permit if over 10 m²
Detached, 10 m² or less, by a door
permit if more than 600 mm above grade
A deck that needs no permit must still meet the Zoning By-law and all other applicable regulations.
How close to the property line can a deck or porch be?
It depends on the yard the zone requires. Under Zoning By-law No. 05-200 a porch, deck or canopy may encroach into any required yard by up to 1.5 metres, or half the depth of the required yard, whichever is less. A fire escape or exterior staircase may encroach the same distance into a required side or rear yard, and an unenclosed wheelchair ramp may encroach into any required yard with no maximum.
Parts of Hamilton are still governed by the former municipalities' zoning by-laws, which set their own figures; look up the property on the City's zoning map or call 905-546-2424 ext. 2719.
Do I need a permit for a shed, gazebo or detached garage?
Not if it is accessory to a detached, semi-detached or row house and is no more than 15 square metres, no more than one storey, and has no plumbing. Anything larger needs a permit, as does any detached structure that contains plumbing, however small. The City counts garden sheds, gazebos, garages, pergolas, greenhouses, shipping containers and prefabricated structures as accessory buildings; they may not be used for commercial purposes or lived in.
For buildings other than houses the exemption is 10 square metres with no plumbing.
How big can a shed be, and how far from the lot line?
Under Zoning By-law No. 05-200, accessory buildings for houses may be no higher than 4.5 metres, may not sit in a front or flankage yard, and together may cover no more than 45 square metres or 7.5 per cent of the lot area, whichever is less. One with a gross floor area under 18 square metres must be at least 1.0 metre from the rear and side lot lines; at 18 square metres or more the setback is 1.2 metres. A vehicle entrance that faces a street line must be set back 6.0 metres from it.
Maximum height
4.5 m
Combined lot coverage
45 m² or 7.5% of the lot, whichever is less
Setback, under 18 m²
1.0 m from rear and side lot lines
Setback, 18 m² or more
1.2 m from rear and side lot lines
Gazebos, pergolas and carports are accessory buildings but are not counted toward lot coverage or floor area limits. These rules exclude the A1 and A2 rural zones, and lots under the former municipalities' zoning by-laws have their own limits.
Do fences, pools and hot tubs need a building permit?
A fence does not, unless it encloses a pool. A swimming pool itself does not need a building permit, but its enclosure does, and so does a deck built with or next to the pool. Landscaping needs no building permit, although changes in grading may need a Site Alteration Permit.
Only for a large one. A tent, or a group of tents, needs a building permit when the area exceeds 60 square metres; tents no more than 3.0 metres apart count as a group. A tent or group is exempt if it totals no more than 60 square metres, is not attached to a building, and stands more than 3.0 metres from all other structures.
Even without a permit the tent must meet the Zoning By-law.
Yes. The City's list of work that requires a building permit includes interior alterations, among them finishing or partially finishing a basement or other unfinished space, creating or relocating rooms, a walkout basement, and installing or replacing drywall and insulation as a material alteration. Underpinning to lower a basement, a backwater valve, a sump pump and an internal weeping tile system each need a permit too.
Turning the basement into a separate apartment is an additional dwelling unit, with its own permit and fee.
Do I need a permit to remove a wall or change a window?
Yes for walls: adding or removing a wall needs a permit whether or not it is load bearing, as do beams and lintels and repairs to structural members. For windows and doors, you need a permit to create a new opening, enlarge one or relocate one. Replacing existing windows with the same size in the same location needs no permit where no fire resistance rating is required.
Not for re-shingling a roof with the same roofing material. Replacing roofing or exterior cladding with a different material does need a permit, as do repairs to structural members such as roof sheathing, and installing solar panels. Repairing eavestroughs needs no permit where the drainage stays within your property.
Do plumbing, furnace or fireplace jobs need a permit?
New plumbing or relocated plumbing needs a permit; replacing existing fixtures in the same location does not. Replacing a furnace needs no building permit, but new or replacement ductwork, a wood stove or a fireplace does. Septic system installation, repair or replacement needs a permit, and so does waterproofing or damp-proofing foundation walls or replacing weeping tile.
Electrical work is permitted and inspected by the Electrical Safety Authority, not the City: 1-877-372-7233.
Minor millwork, cabinetry and flooring such as carpet, laminate or hardwood; painting and decorating; re-shingling with the same material; replacing plumbing fixtures in the same location; replacing windows with the same size in the same location where no fire rating is required; replacing a furnace; a fence that does not enclose a pool; landscaping; and a shed of 15 square metres or less with no plumbing that is accessory to a house.
If you are unsure, the City asks you to contact the Building Division at 905-546-2720 or building@hamilton.ca before starting.
A permit is required to demolish a structure of 10 square metres or more, and for a partial demolition of a building or an attached structure. The exception matches the one for building: an accessory structure to a house that is not more than 15 square metres, one storey and without plumbing can be demolished without a permit.
What drawings do I need for a deck or shed permit?
A site plan showing the house and the size and location of the new structure, with setbacks to all property lines, easements, and other accessory buildings, decks or pools on the lot; and construction drawings. For a deck these show footings or piers, joist and beam sizes and spans, stairs, guards and handrails; for a shed, the height to the roof peak, slab or foundation, openings, studs and roof framing. The City posts sample drawings and a checklist for each.
As the owner you may prepare the drawings yourself. Applications are made online through my.hamilton.ca.
How much is a permit for a deck, basement or shed?
The fee is the floor area of the work multiplied by a rate per square metre, with a minimum permit fee of $291. The rates for work on a detached, semi-detached or row house are $5.36 for a deck, balcony, open porch or stairs, $6.58 for a garage or storage shed, and $4.06 for finishing a basement. Solar collectors on a house and a backwater valve are $291 each, and exterior barrier-free access is free.
Minimum permit fee
$291
Deck, balcony, open porch, stairs
$5.36 per m²
Garage, storage shed
$6.58 per m²
Finishing a basement
$4.06 per m²
Accessory structure demolition
$0.54 per m², minimum $188
Tents
$2.18 per m², maximum $464
A proposed 3 per cent increase to building permit fees goes to a public meeting of the Planning Committee on December 1, 2026.
Ontario One Call at 1-800-400-2255, open 24 hours, to locate underground services before you dig; the Electrical Safety Authority at 1-877-372-7233 for electrical permits and inspections; and Hydro One for disconnects and clearance from wires. If the property is near a natural feature or the Niagara Escarpment, a conservation authority or Niagara Escarpment Commission approval may be needed before the City can issue a permit.
Any contractor you hire for building repair, plumbing, drains or heating must hold a City of Hamilton trade licence.