Skip to content
HamiltonIQ
Development application PSR-17-209, DA-18-138 · Ward 5 · Stoney Creek

71-85 Centennial Pky S

pre-application consultation, site plan

Stage: Under reviewOn the record: “In Process; Approved”Filed 2017–2018
“To develop a 7 storey retirement home/apartment with 147 suites consisting of studios, one and two bedrooms, as well as long term care and offices.”
The City of Hamilton’s description, in its own words · checked November 28, 2026

Where it stands

Stage from the City of Hamilton’s status, November 28, 2026

Filed with the municipality and being reviewed.

Diagram of the zoning around 71-85 Centennial Pky SThe municipality's zoning polygons within about 140 metres of the file's recorded point. A diagram, not to scale and not a survey: no building or design is drawn.C2I1R1R1Diagram, not to scaleCity of Hamilton zoning and planning open data
Zoning areas around the site. Streets show as the gaps between zones. No building or design is drawn. File PSR-17-209.
159
homes proposed
City of Hamilton record
2
applications in this project: pre-application consultation, site plan
City of Hamilton record
2017–18
filing years
As the record states it
How we know
Last checked November 28, 2026City of HamiltonHow we know
Publisher
City of Hamilton
Source dataset
Development Applications (Open Hamilton)
Retrieved
November 28, 2026
Licence
City of Hamilton's Open Data Licence (Version 1.1 - January 2017) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by HamiltonIQ
the stage label · grouping of linked applications into one project · community and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
HamiltonIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “To develop a 7 storey retirement home/apartment with 147 suites consisting of studios, one and two bedrooms, as well as long term care and offices”. Status on the record: “In Process”. Files PSR-17-209, DA-18-138. As of November 28, 2026 · City of Hamilton

Data currency. Read from the City of Hamilton source on November 28, 2026. The source was last edited November 9, 2026. Only 2,091 of 5,280 records carry a date; the newest is November 2, 2026. Filing years 2016–2026. Development Applications (Open Hamilton)

What is being asked

2 applications

71-85 Centennial Pky S is the site of 2 applications on the City of Hamilton's record (pre-application consultation, site plan) proposing 159 homes in Stoney Creek, Ward 5. It is under review and has not been decided. Filed between 2017 and 2018.

What is proposed

To develop a 7 storey retirement home/apartment with 147 suites consisting of studios, one and two bedrooms, as well as long term care and offices.

To develop a seven storey, 12,502 SqM (with basement) retirement home/apartment with 158 suits consisting of studios, one and two bedrooms, as well as long term care, offices, 79 parking spaces and one loading space.

The City of Hamilton’s description of the applications, as published.

The 2 applications

The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.

  1. Pre-application consultation

    PSR-17-209

    Type
    Pre-application consultation (Preliminary Site Plan Review)
    Status on the record
    In Process
    Filing year
    2017
    Proposed use (City category)
    Mixed Use
    Homes proposed
    147
  2. Site plan

    DA-18-138

    Type
    Site plan (Site Plan)
    Status on the record
    Approved
    Filing year
    2018
    Proposed use (City category)
    Mixed Use
    Homes proposed
    159

Other projects within 1 km

Development in Ward 5
71-85 Centennial Pky S and other planning files within 1 km71-85 Centennial Pky S (ringed) and 23 other significant files on the City of Hamilton's record within 1 km, over the zoning layer.68 Centennial Pky S · Approved · 110 m42 Centennial Pkwy S · Status not published · 210 m61 Clapham Rd · Under review · 440 m75 Centennial Pkwy N · Under review · 460 m75 Centennial Parkway North · Under review · 510 m870 Queenston Rd · Closed · 540 m106 King Street W · Under review · 570 m102 King St W · Status not published · 570 m860 Queenston Rd · Under review · 580 m118 King St W · Under review · 590 m865 Queenston Rd · Approved · 620 m2874, 2880 and 2900 KING ST E · Under review · 670 m2900 King St E · Under review · 690 m2900 King Street East · Under review · 700 m61 King Street West · Under review · 750 m61 King St W · Status not published · 760 m2798 King St E · Approved · 810 m651 Queenston Rd · Under review · 920 m2750 King St E · Under review · 920 m651 Queenston Road · Under review · 920 m12 Centennial Pky S · Under review · 950 m928 Queenston Rd · Approved · 970 m16 King St W · Approved · 970 m1 km around the siteCity of Hamilton open data
  • This project
  • Under review (14)
  • Approved (5)
  • Closed (1)
  • Status not published (3)
  • 1 km

Statuses as the City of Hamilton publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

71-85 Centennial Pky S
Aerial view of 71-85 Centennial Pky S, Hamilton
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Community facilities nearby

Schools, heritage and transit

Nearest schools

Heritage register properties nearby(within 1.0 km, as the crow flies)

Transit routes nearby(a published route path within 500 m, as the crow flies)

3 more within that distance; all of them.

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every HamiltonIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.71-85 Centennial Pky S is here.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.
Stage: Complete
Final approval has been given or the plan has been registered.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.
Stage: Refused
The application was refused.

Sources

  1. 01Development Applications (Open Hamilton) — checked November 28, 2026

Contains public sector Data made available under the City of Hamilton’s Open Data Licence City of Hamilton's Open Data Licence (Version 1.1 - January 2017). Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.

More