Skip to content
HamiltonIQ
Development application PLC-16-008 · Ward 9 · Stoney Creek

Plc-16-008

part lot control

Stage: ApprovedOn the record: “Approved”Filed 2016
“To Remove Part Lot Control to create 22 Semi Detached units and 11 lots”
The City of Hamilton’s description, in its own words · checked November 28, 2026

Where it stands

Stage from the City of Hamilton’s status, November 28, 2026

The application has been approved. Building may not have started.

Diagram of the zoning around Plc-16-008The municipality's zoning polygons within about 140 metres of the file's recorded point; the point falls in a zone coded R1. A diagram, not to scale and not a survey: no building or design is drawn.I2Diagram, not to scaleCity of Hamilton zoning and planning open data
Zoning areas around the site; the recorded point falls in R1 today, which is the zone, not the proposal. Streets show as the gaps between zones. No building or design is drawn. File PLC-16-008.
22
homes proposed
City of Hamilton record
1
application in this project: part lot control
City of Hamilton record
2016
filing year
As the record states it
How we know
Last checked November 28, 2026City of HamiltonHow we know
Publisher
City of Hamilton
Source dataset
Development Applications (Open Hamilton)
Retrieved
November 28, 2026
Licence
City of Hamilton's Open Data Licence (Version 1.1 - January 2017) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by HamiltonIQ
the stage label · grouping of linked applications into one project · community and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
HamiltonIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “To Remove Part Lot Control to create 22 Semi Detached units and 11 lots”. Status on the record: “Approved”. File PLC-16-008. As of November 28, 2026 · City of Hamilton

Data currency. Read from the City of Hamilton source on November 28, 2026. The source was last edited November 9, 2026. Only 2,091 of 5,280 records carry a date; the newest is November 2, 2026. Filing years 2016–2026. Development Applications (Open Hamilton)

What is being asked

One application

Plc-16-008 is a part lot control on the City of Hamilton's record proposing 22 homes in Stoney Creek, Ward 9. It has been approved. Filed in 2016.

What is proposed

To Remove Part Lot Control to create 22 Semi Detached units and 11 lots

The City of Hamilton’s description of the application, as published.

The application

As the municipality records it.

  1. Part lot control

    PLC-16-008

    Type
    Part lot control (Part Lot Control)
    Status on the record
    Approved
    Filing year
    2016
    Proposed use (City category)
    Residential
    Homes proposed
    22

Other projects within 1 km

Development in Ward 9
Plc-16-008 and other planning files within 1 kmPlc-16-008 (ringed) and 33 other significant files on the City of Hamilton's record within 1 km, over the zoning layer.78 Narbonne Cres · Approved · 230 m19 Picardy Dr · Approved · 300 m15 Picardy Dr · Approved · 310 m19 Picardy Drive · Under review · 330 m1-43 Bayonne Dr, 1-44 Talence Dr · Approved · 360 m67-113 Picardy Drive · Approved · 380 m185 Lormont Blvd · Approved · 400 mPlc-16-011 · Approved · 440 m56 Highland Road West · Under review · 470 m56 Highland Rd W · Under review · 470 m56 Highland Rd · Under review · 470 mPlc-16-010 · Approved · 480 m157 Upper Centennial Pkwy · Under review · 480 m157 Up Centennial Pky · Approved · 480 m1-71 Bradbury Rd · Approved · 630 m10-92 Bradbury Rd · Approved · 650 m222 First Rd W · Approved · 650 m165 Upper Centennial Parkway · Under review · 660 m19 HIGHLAND RD E and 138 UP CENTENNIAL PKY · Approved · 740 m23-61 Carlson Street · Under review · 770 m82 Carlson Street · Under review · 810 m219 Up Centennial Pky · Under review · 810 m82 Carlson St, 238, 240 and 242 Highland Rd W · Approved · 830 m82 Carlson St · Under review · 840 m250 First Rd W · Under review · 860 m250 First Road West · Under review · 870 m93 Penny Lane · Under review · 940 m237 Upper Centennial Parkway · Under review · 950 m59 Penny Lane · Under review · 950 m70 Upper Centennial Pkwy · Under review · 950 m51 Penny Lane · Under review · 960 m13 Penny Lane · Under review · 960 m51 and 59 PENNY LANE · Under review · 970 m1 km around the siteCity of Hamilton open data
  • This project
  • Under review (19)
  • Approved (14)
  • 1 km

Statuses as the City of Hamilton publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

Aerial view of Plc-16-008, Hamilton
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Schools, heritage and transit

Nearest schools

Transit routes nearby(a published route path within 500 m, as the crow flies)

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every HamiltonIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.Plc-16-008 is here.
Stage: Complete
Final approval has been given or the plan has been registered.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.
Stage: Refused
The application was refused.

Sources

  1. 01Development Applications (Open Hamilton) — checked November 28, 2026

Contains public sector Data made available under the City of Hamilton’s Open Data Licence City of Hamilton's Open Data Licence (Version 1.1 - January 2017). Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.

More