237 Upper Centennial Parkway
pre-application consultation
“To construct a 5-6 storey mixed-use building, with commercial and amenity spaces, as well as a 645 m2 office space on the ground floor. The upper floors will accommodate 150 residential dwelling units. Includes 145 parking spaces, (88 underground, 57 at g”
Where it stands
Stage from the City of Hamilton’s status, November 28, 2026Filed with the municipality and being reviewed.
How we know
Last checked November 28, 2026City of HamiltonHow we know
- Publisher
- City of Hamilton
- Source dataset
- Development Applications (Open Hamilton)
- Retrieved
- November 28, 2026
- Licence
- City of Hamilton's Open Data Licence (Version 1.1 - January 2017) Terms
- From the source
- the project and application names · file numbers · status · dates where recorded · the description of the proposal
- Derived by HamiltonIQ
- the stage label · grouping of linked applications into one project · community and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
- HamiltonIQ’s words
- the summary sentence
- Kept current
- Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.
Proposed, in the record's words: “To construct a 5-6 storey mixed-use building, with commercial and amenity spaces, as well as a 645 m2 office space on the ground floor. The upper floors will accommodate 150 residential dwelling units. Includes 145…”. Latest dated step on the record: application received, March 28, 2024. File FCSP-24-040. As of November 28, 2026 · City of Hamilton
Data currency. Read from the City of Hamilton source on November 28, 2026. The source was last edited November 9, 2026. Only 2,091 of 5,280 records carry a date; the newest is November 2, 2026. Filing years 2016–2026. Development Applications (Open Hamilton)
What is being asked
237 Upper Centennial Parkway is a pre-application consultation on the City of Hamilton's record proposing 150 homes in Stoney Creek, Ward 9. It is under review and has not been decided.
What is proposed
To construct a 5-6 storey mixed-use building, with commercial and amenity spaces, as well as a 645 m2 office space on the ground floor. The upper floors will accommodate 150 residential dwelling units. Includes 145 parking spaces, (88 underground, 57 at g
The City of Hamilton’s description of the application, as published.
The application
As the municipality records it.
Pre-application consultation
FCSP-24-040
- Type
- Pre-application consultation (Formal Consultation)
- Status on the record
- In Process
- Filing year
- 2024
- Received
- March 28, 2024
- Proposed use (City category)
- Mixed Use
- Homes proposed
- 150
What has happened
Application received
Pre-application consultation · FCSP-24-040 · 2024
The record shows nothing dated after March 28, 2024; the next recorded step appears here when the municipality enters it.
Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.
Other projects within 1 km
Development in Ward 9- This project
- Under review (14)
- Approved (15)
- 1 km
- 13 Penny LaneStage: Under reviewPre-application consultation · Ward 9 · 130 m
- 219 Up Centennial PkyStage: Under reviewPre-application consultation · Ward 9 · 140 m
- 51 Penny LaneStage: Under reviewPre-application consultation · Ward 9 · 200 m
- 51 and 59 PENNY LANEStage: Under reviewPre-application consultation · Ward 9 · 220 m
- 59 Penny LaneStage: Under reviewPre-application consultation · Ward 9 · 220 m
Statuses as the City of Hamilton publishes them; distances straight-line from the file’s recorded point · November 28, 2026
Around the site
Parks nearby
- Felker ParkNeighbourhood · 930 m
- Maplewood Green ParkNeighbourhood · soccer field · 990 m
Schools, heritage and transit
Nearest schools
- Saltfleet High School · secondary school · 890 m
- St. James the Apostle Catholic Elementary School · elementary school · 1.1 km
- Mount Albion Public School · elementary school · 1.7 km
Transit routes nearby(a published route path within 500 m, as the crow flies)
- Route 44 Rymal · regular route · path 70 m away
- Route 43 Stone Church · regular route · path 190 m away
Distances are between recorded positions, as the crow flies, not walking routes.
What the stages mean
- Stage: Pre-application
- Proposed to the municipality, but a complete application has not yet been received.
- Stage: Under review
- Filed with the municipality and being reviewed.237 Upper Centennial Parkway is here.
- Stage: Under appeal
- A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
- Stage: On hold
- The municipality lists the application as on hold, for example while it waits for more material.
- Stage: Approved
- The application has been approved. Building may not have started.
- Stage: Complete
- Final approval has been given or the plan has been registered.
- Stage: Closed
- The municipality has closed this application file. The record lists what was recorded.
- Stage: Refused
- The application was refused.
Sources
- 01Development Applications (Open Hamilton) — checked November 28, 2026
Contains public sector Data made available under the City of Hamilton’s Open Data Licence City of Hamilton's Open Data Licence (Version 1.1 - January 2017). Figures are the municipality’s records at the date checked; a later submission can change them.
How we draw the diagram
The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.