Skip to content
HamiltonIQ
Development application FCSP-24-040 · Ward 9 · Stoney Creek

237 Upper Centennial Parkway

pre-application consultation

Stage: Under reviewOn the record: “In Process”Filed March 28, 2024
“To construct a 5-6 storey mixed-use building, with commercial and amenity spaces, as well as a 645 m2 office space on the ground floor. The upper floors will accommodate 150 residential dwelling units. Includes 145 parking spaces, (88 underground, 57 at g”
The City of Hamilton’s description, in its own words · checked November 28, 2026

Where it stands

Stage from the City of Hamilton’s status, November 28, 2026

Filed with the municipality and being reviewed.

Diagram of the zoning around 237 Upper Centennial ParkwayThe municipality's zoning polygons within about 140 metres of the file's recorded point. A diagram, not to scale and not a survey: no building or design is drawn.C7C7Diagram, not to scaleCity of Hamilton zoning and planning open data
Zoning areas around the site. Streets show as the gaps between zones. No building or design is drawn. File FCSP-24-040.
150
homes proposed
City of Hamilton record
1
application in this project: pre-application consultation
City of Hamilton record
1
dated step on the record; the latest March 28, 2024
Checked November 28, 2026
How we know
Last checked November 28, 2026City of HamiltonHow we know
Publisher
City of Hamilton
Source dataset
Development Applications (Open Hamilton)
Retrieved
November 28, 2026
Licence
City of Hamilton's Open Data Licence (Version 1.1 - January 2017) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by HamiltonIQ
the stage label · grouping of linked applications into one project · community and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
HamiltonIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “To construct a 5-6 storey mixed-use building, with commercial and amenity spaces, as well as a 645 m2 office space on the ground floor. The upper floors will accommodate 150 residential dwelling units. Includes 145…”. Latest dated step on the record: application received, March 28, 2024. File FCSP-24-040. As of November 28, 2026 · City of Hamilton

Data currency. Read from the City of Hamilton source on November 28, 2026. The source was last edited November 9, 2026. Only 2,091 of 5,280 records carry a date; the newest is November 2, 2026. Filing years 2016–2026. Development Applications (Open Hamilton)

What is being asked

One application

237 Upper Centennial Parkway is a pre-application consultation on the City of Hamilton's record proposing 150 homes in Stoney Creek, Ward 9. It is under review and has not been decided.

What is proposed

To construct a 5-6 storey mixed-use building, with commercial and amenity spaces, as well as a 645 m2 office space on the ground floor. The upper floors will accommodate 150 residential dwelling units. Includes 145 parking spaces, (88 underground, 57 at g

The City of Hamilton’s description of the application, as published.

The application

As the municipality records it.

  1. Pre-application consultation

    FCSP-24-040

    Type
    Pre-application consultation (Formal Consultation)
    Status on the record
    In Process
    Filing year
    2024
    Received
    March 28, 2024
    Proposed use (City category)
    Mixed Use
    Homes proposed
    150

What has happened

Every dated item on the record
  1. Application received

    Pre-application consultation · FCSP-24-040 · 2024

The record shows nothing dated after March 28, 2024; the next recorded step appears here when the municipality enters it.

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

Other projects within 1 km

Development in Ward 9
237 Upper Centennial Parkway and other planning files within 1 km237 Upper Centennial Parkway (ringed) and 29 other significant files on the City of Hamilton's record within 1 km, over the zoning layer.13 Penny Lane · Under review · 130 m219 Up Centennial Pky · Under review · 140 m51 Penny Lane · Under review · 200 m51 and 59 PENNY LANE · Under review · 220 m59 Penny Lane · Under review · 220 m93 Penny Lane · Under review · 330 m10-92 Bradbury Rd · Approved · 340 m267-293 Upper Centennial Pkwy · Approved · 350 m1-71 Bradbury Rd · Approved · 390 mPlc-16-010 · Approved · 470 m165 Upper Centennial Parkway · Under review · 480 m67-113 Picardy Drive · Approved · 580 m157 Up Centennial Pky · Approved · 640 m157 Upper Centennial Pkwy · Under review · 650 m185 Lormont Blvd · Approved · 670 mPlc-16-011 · Approved · 680 m1-43 Bayonne Dr, 1-44 Talence Dr · Approved · 700 m222 First Rd W · Approved · 730 m250 First Road West · Under review · 740 m56 Highland Road West · Under review · 750 m19 HIGHLAND RD E and 138 UP CENTENNIAL PKY · Approved · 760 m250 First Rd W · Under review · 760 m78 Narbonne Cres · Approved · 780 m56 Highland Rd W · Under review · 780 m56 Highland Rd · Under review · 800 m15 Picardy Dr · Approved · 820 m19 Picardy Drive · Under review · 830 m19 Picardy Dr · Approved · 830 mPlc-16-008 · Approved · 950 m1 km around the siteCity of Hamilton open data
  • This project
  • Under review (14)
  • Approved (15)
  • 1 km
  • 13 Penny Lane
    Pre-application consultation · Ward 9 · 130 m
    Stage: Under review
  • 219 Up Centennial Pky
    Pre-application consultation · Ward 9 · 140 m
    Stage: Under review
  • 51 Penny Lane
    Pre-application consultation · Ward 9 · 200 m
    Stage: Under review
  • 51 and 59 PENNY LANE
    Pre-application consultation · Ward 9 · 220 m
    Stage: Under review
  • 59 Penny Lane
    Pre-application consultation · Ward 9 · 220 m
    Stage: Under review

Statuses as the City of Hamilton publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

237 Upper Centennial Parkway
Aerial view of 237 Upper Centennial Parkway, Hamilton
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Schools, heritage and transit

Nearest schools

Transit routes nearby(a published route path within 500 m, as the crow flies)

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every HamiltonIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.237 Upper Centennial Parkway is here.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.
Stage: Complete
Final approval has been given or the plan has been registered.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.
Stage: Refused
The application was refused.

Sources

  1. 01Development Applications (Open Hamilton) — checked November 28, 2026

Contains public sector Data made available under the City of Hamilton’s Open Data Licence City of Hamilton's Open Data Licence (Version 1.1 - January 2017). Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.

More