Skip to content
HamiltonIQ
Development application PLC-25-013 · Ward 9 · Glanbrook

226 and 252 Citadella Boulevard

part lot control

Stage: Under reviewOn the record: “In Process”Filed November 17, 2025
“To create 14 lots for townhouse dwelling units (Parts 1 to 18 inclusive) and four access and maintenance easements (Parts 15 to 18 inclusive) from Blocks 96 and 97, as shown on Registered Plan No. 62M-1280.”
The City of Hamilton’s description, in its own words · checked November 28, 2026

Where it stands

Stage from the City of Hamilton’s status, November 28, 2026

Filed with the municipality and being reviewed.

14
homes proposed
City of Hamilton record
1
application in this project: part lot control
City of Hamilton record
1
dated step on the record; the latest November 17, 2025
Checked November 28, 2026
How we know
Last checked November 28, 2026City of HamiltonHow we know
Publisher
City of Hamilton
Source dataset
Development Applications (Open Hamilton)
Retrieved
November 28, 2026
Licence
City of Hamilton's Open Data Licence (Version 1.1 - January 2017) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by HamiltonIQ
the stage label · grouping of linked applications into one project · community and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
HamiltonIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “To create 14 lots for townhouse dwelling units (Parts 1 to 18 inclusive) and four access and maintenance easements (Parts 15 to 18 inclusive) from Blocks 96 and 97, as shown on Registered Plan No. 62M-1280”. Latest dated step on the record: application received, November 17, 2025. File PLC-25-013. As of November 28, 2026 · City of Hamilton

Data currency. Read from the City of Hamilton source on November 28, 2026. The source was last edited November 9, 2026. Only 2,091 of 5,280 records carry a date; the newest is November 2, 2026. Filing years 2016–2026. Development Applications (Open Hamilton)

What is being asked

One application

226 and 252 Citadella Boulevard is a part lot control on the City of Hamilton's record proposing 14 homes in Glanbrook, Ward 9. It is under review and has not been decided.

What is proposed

To create 14 lots for townhouse dwelling units (Parts 1 to 18 inclusive) and four access and maintenance easements (Parts 15 to 18 inclusive) from Blocks 96 and 97, as shown on Registered Plan No. 62M-1280.

The City of Hamilton’s description of the application, as published.

The application

As the municipality records it.

  1. Part lot control

    PLC-25-013

    Type
    Part lot control (Part Lot Control)
    Status on the record
    In Process
    Filing year
    2025
    Received
    November 17, 2025
    Proposed use (City category)
    Residential
    Homes proposed
    14

What has happened

Every dated item on the record
  1. Application received

    Part lot control · PLC-25-013 · 2025

The record shows nothing dated after November 17, 2025; the next recorded step appears here when the municipality enters it.

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

Other projects within 1 km

Development in Ward 9
226 and 252 Citadella Boulevard and other planning files within 1 km226 and 252 Citadella Boulevard (ringed) and 19 other significant files on the City of Hamilton's record within 1 km, over the zoning layer.141 Cittadella Blvd · Approved · 150 m2080 Rymal Road East · Under review · 310 m52 Bonhill Boulevard · Under review · 310 m2080 Rymal Rd E · Under review · 310 m2130 Rymal Rd E · Approved · 350 m2-48 Bonhill Blvd · Under review · 350 m2126 Rymal Rd E · Approved · 370 m3 Bonhill Blvd · Under review · 390 m65-105 Bethune Ave, 62-102 Citadella Blvd · Approved · 470 m188-228 Dalgleish Trail · Approved · 480 m2100 Rymal Rd E · Under review · 490 m8 Kingsborough Dr · Under review · 510 m2070 Rymal Road East · Approved · 530 m2119 Rymal Rd · Under review · 600 m2070 Rymal Rd E · Under review · 610 m100 Terryberry Road · Under review · 630 m2153 Rymal Rd E · Under review · 700 m315 Dalgeish Trail · Approved · 800 m315 Dalgleish Trail · Approved · 830 m1 km around the siteCity of Hamilton open data
  • This project
  • Under review (11)
  • Approved (8)
  • 1 km

Statuses as the City of Hamilton publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

226 and 252 Citadella Boulevard
Aerial view of 226 and 252 Citadella Boulevard, Hamilton
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Schools, heritage and transit

Nearest schools

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every HamiltonIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.226 and 252 Citadella Boulevard is here.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.
Stage: Complete
Final approval has been given or the plan has been registered.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.
Stage: Refused
The application was refused.

Sources

  1. 01Development Applications (Open Hamilton) — checked November 28, 2026

Contains public sector Data made available under the City of Hamilton’s Open Data Licence City of Hamilton's Open Data Licence (Version 1.1 - January 2017). Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.

More