By-law 05-200 · Industrial Zones
M12 · Extractive Industrial
M12 is the Extractive Industrial zone under the City of Hamilton's Zoning By-law 05-200. It is drawn on 9 zone polygons covering about 830 hectares, mostly in Flamborough planning unit 1500, East Mountain Area and Flamborough planning unit 1300. 5 carry a special exception.
- M12
- Extractive Industrial
- Zoning By-law 05-200
- Industrial Zones
- 9
- 830
- 5
- 0
- 4
Where M12 applies
Polygons and hectares by the City of Hamilton’s neighbourhood outlines, each polygon placed by a point inside it.
- Flamborough planning unit 15005 · 722 hectares
- East Mountain Area2 · 95 hectares
- Flamborough planning unit 13001 · 7.1 hectares
- Kelly1 · 5.6 hectares
Exceptions, holding and other markers
The markers the layer records on M12 polygons. Their terms are written only in the by-law; each line says where.
- Special exception (5 polygons)
- 658 (×3), 150, 219
- Drawn over another polygon
- 2 zone polygons sit inside another polygon on the layer (the map draws one zone over another without cutting a hole). Their hectares are counted here and in the other zone; the by-law map decides which applies.
What the zone permits
The permitted uses and regulations for M12 are set out in Section 9.12, Zoning By-law 05-200. HamiltonIQ does not paraphrase them: an exception, a holding provision or a later amendment can change what applies to one lot. The City of Hamilton’s Zoning Verification Report Application is the City of Hamilton’s own answer for a property. The interactive zoning map shows the zone on a single lot.
Sources
City of Hamilton
Section 9.12, Zoning By-law 05-200City of Hamilton
Zoning By-law Boundary (open data layer)City of Hamilton
Zoning By-law 05-200: where it applies